Repowering Project
GenConn

Middletown & Devon, CT

As a subcontractor on this project, BAC installed over 2,000 steel H-piles at these two project sites. The Devon site required 50 foot order length piles driven in one piece using BAC cranes and diesel hammers. The Middletown site required 110 foot long piles which were driven to 50 feet with BAC's ABI Mobilram, field spliced and driven to refusal with diesel hammers. BAC also installed drainage and other civil work for both the GC and the Owner of these two sites.